Bad Lauchstädt
Project Description:
Construction of a fire water storage tank and a stormwater retention basin on the site of the planned Bad Lauchstädt Energy Park.
Execution:
1,490 m² sheet pile wall
45 prestressed grouted piles
Total length of grouted piles: 540 m
Kraftwerk Isar Altheim
Project Description:
Construction of an operations building as well as foundation basins for the switchgear systems in the Isar and Altheim substations as part of the expansion of the SuedOstLink direct current connection.
Execution:
3,375 m² watertight sheet pile wall system
564 m micropiles
1,340 m³ underwater concrete
Riedleitung Süd
Project Description:
Redundant new installation of the Riedleitung Süd pipeline, including the construction of coupling and connection structures in the Hessisches Ried region.
Execution:
Braced, watertight sheet pile cofferdam with a back-anchored underwater concrete base slab; walers and bracing executed using the Groundforce system.
Niehler Hafenbrücke
Project Description:
Rehabilitation of the Niehler Hafenbrücke pedestrian and cyclist bridge in Cologne.
Execution:
Supply of high-strength S670/800 threaded bars Ø 63.5 mm including bearing assemblies as temporary support for the tension zone to secure the rehabilitation works.
Pumpspeicherkraftwerk Waldeck I
Project Description:
Modernisation of the Waldeck I pumped-storage power plant in Edertal – construction of a seepage water monitoring shaft (South).
Execution:
Design of a mined shotcrete shaft with an internal diameter of 6.00 m and a depth of up to 10.45 m.
To ensure the stability of the 40 cm thick shotcrete lining, 54 vertically arranged injection bored piles were installed along the outer shaft wall with a total length of 537.70 m.
Hochbau Supernova, Slowenien
Leistungsumfang:
2.700 m Mikropfähle, Hohlstab H108-4000